Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 08/19/2002 <br />User: JRS <br />State :Colorado <br />County :Gunnison <br />Site : Bear No. 3 Mrne <br />Permit/job# : C-81-033 <br />Abbreviation :none <br />Filename : C033-001 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />task description : Regrade Facilities Area <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $48.47 NA <br /> Operating cosUhour : $58.82 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $30.65 NA <br /> Tofal unit cosf/hour : $137.94 Total fleet cosVhour : $137.94 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,823 CCY factor : 1.125 volume: 12,17(1 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors ~~~ Source <br /> Operator skill ; 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Earth - Drypacked Adjusted unit production : 256.33 LCY/hr <br /> Adjusted fleet production : 256.33 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers} Total job time : 47.50 Hours <br />Unit cost : $0.538 /LCY Total job cost : $6, 552 <br />