EXHIBIT D <br /> MINING PLAN <br /> Very little has changed from the original mining plan. Mining Phases 10, 11, 13 will not be <br /> mined and have been removed from the permitted area. Currently the Bestway Paving is <br /> mining a portion of land on the northwest side of the permit area (Phase A). Gravel depths <br /> pinch out to the north in Phase A. Following the completion of Phase A, Bestway will mine <br /> out the remaining deposit, Phase B. A large portion of this area has been has been partially <br /> mined. Both Phases are expected,to be completed in five years. <br /> The northeast corner of the site, 4ere the administration building, maintenance shop, asphalt <br /> batch plant, and various other buildings and storage tanks, has been removed from the permit <br /> area. These structures are actually associated more with the asphalt paving business and will <br /> be permanent. The asphalt plant is currently and will continue to be supplied with rock from <br /> other locations to run the operation once the Pit No. 1 deposit has been mined out. <br /> All other aspects of the mining plan will remain unchanged. <br />