My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01551
DRMS
>
Back File Migration
>
Revision
>
REV01551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:59:08 AM
Creation date
11/21/2007 8:53:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
9/3/1992
Doc Name
SOMERSET MINING CO MIDTERM REVIEW 2 APPLICATION FOR A TECHNICAL REVISION PN C-81-022
From
J STOVER & ASSOCIATES
To
MLRD
Type & Sequence
TR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S. S. Shuey <br />Midterm Review No. 2 <br />September 1, 1992 <br />Page 4 <br />23. Your comment regarding the possible necessity to remove the <br />portal collars at the Bear and Hubbard Creek vent facilities <br />is noted. <br />24a. Page H-4 was revised to incorporate the Division's comments <br />regarding seedbed preparation. <br />24b. The seed mixes shown on pages H-5 and H-6 were revised as per <br />the Division's recommendations except for the shrub seeding <br />rates shown on page H-5. It is the Operator's understanding <br />that from 0.25 to 1.0 pounds of a particular shrub seed are to <br />be added to a grass mix for successful seeding. <br />24c. Page H-7 was revised to commit to a soil sampling and soil <br />amendment program prior to the commencement of seed, <br />fertilizer and mulch application. <br />25. Enclosed are calculation sheets B-134 through B-137 and <br />drawing B-138 which presents the design plans for the upland <br />diversion ditch that will safely pass the 100-year, 24-hour <br />event away from the east yard gob pile. <br />26. The Division's question regarding Pond 8 will become a moot <br />point after sediment pond B is constructed. Sediment pond B <br />is to be constructed as part of the relocation of the coal <br />stockpile area. This work is currently in progress and <br />sediment pond B will be constructed within two months. After <br />the new sedimentation control system is in place, a technical <br />or minor revision will be processed to delete the outdated <br />sediment control information from the permit. <br />27. The requested flow meter on the Sanborn Creek Mine dewatering <br />pipeline is in place. The permit revision for the Sanborn <br />East Tract addresses this issue on revised page 2.05-46iii. <br />28. No response to this issue at this time. I would like to <br />discuss this issue with you prior to preparing a response. <br />Please call if you have any questions. <br />Sincerely, <br />Jim St~.E. <br />Consulting Engineer <br />Enclosure <br />cc: Basil Bear <br />
The URL can be used to link to this page
Your browser does not support the video tag.