Laserfiche WebLink
., <br />J. J. Dudash - 2 - March 3, 1998 <br />24. - 25. No response required. <br />26. Enclosed are revised pages 2.05-17 8~ 18. The discussion regarding haul road <br />maintenance is presented at the top to page 2.05-18. <br />27. No response required. <br />28. Enclosed is revised page 2.05-48 and new Map No. 32, Topsoil Distribution <br />Plan, which shows the location of the topsoil stockpiles and the areas where <br />topsoil will be spread. <br />29!30. Enclosed is a table which presents BRL's estimates of the reclamation cut <br />and fill volumes. <br />31. No response required. <br />32. BRL would like to close out TR-01 as soon as possible. The minor design <br />issues regarding the culvert leading from the gob pile stockpile to Pond D and <br />diversion and or containment ditches associated with the topsoil stockpiles can <br />be handled in future TR-02. <br />Please call if you have any questions. <br />Sincerely, <br />~~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear. Jr. <br />