My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-11-15_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-11-15_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 12:51:06 PM
Creation date
11/21/2007 8:52:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/15/1990
Doc Name
REPORTERS TRANSCRIPT OF PUBLIC HEARING VOLUME I APPLICATION OF BATTLE MTN RESOURCES INC IN COSTILLA
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />50 <br />1 that is not involved in the processing. <br />2 UNIDENTIFIED PERSON: Did you say that <br />3 the embankment goes up as the tailings increases <br />4 over time at other stages? <br />5 MS. BALDRIGE: Rob will answer this in a <br />6 minute, but I didn't cover that. The embankment is <br />7 built in one stage initially and then there are two <br />8 raises to that initial stage. <br />9 UNIDENTIFIED PERSON: How does the liner <br />10 system work into that? <br />11 UNIDENTIFIED PERSON: (Inaudible). <br />12 MS. BALDRIGE: No, because you want it <br />13 to drain. There a drainage blanket on the upstream <br />14 slope. Underneath the embankment system .is lined. <br />15 The whole valley bottom would be lined, beat not <br />16 either of the embankment faces. <br />17 Rob will get into more spec ifi~.cs on the <br />18 design. <br />19 (Inaudible.) <br />20 MS. BALDRIGE: The diversion e~ystem, as <br />21 I indicated before, is designed for the 100-year, <br />22 24-hour storm. However, there is an extra measure <br />23 of safety built into this project because, should a <br />24 storm greater than a 100-year, 24-hour occur and the <br />25 ditch overtops and the water runs into the tailings <br />AGREN, BLANDO & BILLINGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.