Laserfiche WebLink
1 <br /> <br />1 <br />i <br /> <br />t <br />t <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br /> <br /> <br /> <br />49 <br />1 around the south side of the tailings facility <br />2 designed for the 100-year, 24-hour storm, which has <br />3 been the Mined Land's standard design requirements <br />4 for these type of facilities. <br />5 The diversion ditch on the south side <br />6 comes -- empties into the existing drainage just <br />7 west of the collection ponds, and you can see that <br />e on the map behind you. <br />9 (Discussion off the record.) <br />10 MS. BALDRIGE: This is Figure C-12 from <br />11 the amendment application and this is Figure C-11 <br />12 from the amendment application. This is Phase 1 of <br />13 the tailings distribution and water reclamation <br />14 system and this is Phase 2. <br />15 This is the diversion ditch right here. <br />16 This is -- carries it over the hillside. This will <br />17 be a 48-inch culvert to prevent erosion and then it <br />18 drops back into the existing drainage and into the <br />19 existing channel below. <br />20 This system -- this system is also in <br />21 place in Phase 1. You can see it here. In <br />22 addition, there is a small diversion that comes <br />23 around this side and diverts a small amount of water <br />24 around this side and down into the Rito Seco. <br />25 This is upland water. This isc water <br />AGREN, BLANDO & BILLINGS <br />