Laserfiche WebLink
-z- <br />Application Review Procedures <br />The Division must act upon your application within thirty (30) days of receipt <br />The Division will grant your request for a permit transfer if it firms that the successor operator is capable of assuming all <br />responsibility for the conditions included under the original permit by virtue of acceptable performance and financial warranties. <br />Yotu request is automatically approved if it has trot been denied by the Division within thirty (30) days of filing, <br />]f the Permit Transfer application is denied }rou will be notifud within ten (10) days of the decision deadliae. You may appeal the <br />Division decision to the ;Mined Land Reclamation Boazd by submitting a written Request for Administrative Appeal to the Board <br />within sixty (60) days of the date of the decision (please refer to C.R.S. 3432-107 (FIard Rock Statutes), and C.R.S. 34-32.5-107 <br />(Cons[ucNon Material Rules and Regulations) end CR.S. 4-4-104(9)). <br />Notice of Permit Transfer is acknowledged in the rtbnthly activity report attached to the monthly Board Agenda. <br />Once the Permit Transfer document is approved, the originally submitted Performance and Financial Wartanties will be returned to <br />the pmvious operator, as the previous operator is no longer respoasble for the reclamation of the ttansfered operation <br />OTICE TO SUCCESSOR OPERATOR: <br />1) Once the Permit Transfer is approved, you will be responsible for maintaining the minutg and reclamation operations in <br />compliance with the Mined Land Reclamation Act and the Mirteml Rules and Regulations for Hard Rock, Metal and <br />Designated Mining Operations or the Colorado Land Reclamation Act for the Bxtractlon of Construction Materials and <br />the Construction Material Rules and Regulations. <br />2) All of the application materials, as amended and supplemented, are an integral part of the pernriL They have been <br />incorporated into the pemit by reference. We suggest you keep a copy of the permit, the pem»t application, and a copy <br />of the regulations at the mining operafion as a reference. 1f you are unable to secure a copy of the permit application <br />from the original operator, you may purchase a copy from the Division. <br />3) Changes in the mining and reclamation operations that dilTer tram those described in the permit may require a revision to <br />the permit. We suggest consulting the Mineral Rules and Regulatons or the Construction Material Rules and <br />Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.8 and 1.10 pertains to <br />Amendments, Rule L9 to Technical Revisions, and Rule 1.1 t ro Conversions. <br />4) On your permit anniversary date each year, you MUST submit an annual fee and report to the Division. Please consult <br />C.R.S. 34-32-127(2) for ]lazd Rock and Metal Mines or C.R.S. 34-32.5-125 for all construction materials operations for <br />the applicable annual fee requirements for yotn operation. <br />~I~,nrie•shmexxfonrmtT,aukr Mnxral Prnmtdce <br />gismnacwr <br />