Laserfiche WebLink
<br />-a- <br />/tmb <br />5. A brief description <br />reasonably foreseeable <br />resource lands. <br /> <br />of material subsidence damage or diminution of <br />use of identified structures and renewable <br />6. The subsidence control plan portion of the application will need to <br />be amended to provide a description of measures that will be taken on <br />the surface to prevent and/or mitigate the effects of material damage <br />or lessening of value or foreseeable use of each identified structure <br />and renewable resource land. This description should include a plan <br />for monitoring each structure on a regular basis to determine if any <br />material damage has occurred. <br />6028E <br />