Laserfiche WebLink
Revision to Section 2.05.4(b) <br />MINE SUMMARY <br />Facilities Removal <br />Backfill Pit <br />Eliminate Temporary O.B. Stockpile <br />Reduce Pit Slopes <br />Topsoil Redistribution <br />Revegetation <br />lOX Administration Cost <br />TOTAL MINE COSTS <br />$ 49,178 <br />548,156 <br />226,177 <br />60,638 <br />382,316 <br />135,129 <br />140,159 <br />$1,541,753 <br />3370h Revised January 1985 <br />