My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV01081
DRMS
>
Back File Migration
>
Revision
>
REV01081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:42 AM
Creation date
11/21/2007 8:49:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Revision
Doc Date
10/13/1987
Doc Name
APPLICATION FOR PHASE I BOND RELEASE
From
MORRISON KNUDSEN CO INC
To
MLRD
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revision to Section 2.05.4(b) <br />East Wall <br />22,000 BCY x 1.172 swell = 25,780 LCY <br />25,780 LCY + 653 LCY/hr = 39 machine hours <br />South Hizhwall <br />112,000 BCY x 1.172 = 131,260 LCY <br />131,260 + 653 LCY/hr = 201 machine hours <br />Total D-10 hours = 240 hrs @ 252.66 = $60,638 <br />Topsoil Redistribution <br />It has been determined that 330,765 yards of topsoil will have to be <br />redistributed in 1985. Using a scraper capacity of 27 yd3, the following <br />production rates were determined: <br />Stockpile Yds Time(Min.) (50 min/hr) <br />A 133,863 7.4 182.4 yds/hr <br />B 114,583 6.9 195.7 yds/hr <br />C 7,550 6.7 190.0 yds/hr <br />D 9,115 6.5 207.7 yds/hr <br />E 2,784 7.2 187.5 yds/hr <br />F 62,870 6.5 207.7 yds/hr <br /> TOTAL HOURS <br />Using a 637D scraper <br />1,723 hours @ 221.89/hr = <br />Reveaetation Costs <br />145.3 acres @ $930/acre = <br />$382,316 <br />$135,129 <br />Hours <br />735 <br />586 <br />40 <br />44 <br />15 <br />303 <br />1,723 <br />3370h Revised January 1985 <br />
The URL can be used to link to this page
Your browser does not support the video tag.