.. ; <br />Phase I Bond Release <br />Follow Up Inspection <br />2 <br />Marr Strip Mine <br />c-so-oob <br />the 720 Pit area. Specifically excluded from the current Phase I bond release request are <br />the areas previously referred to as "pre-law" reclamation Marr Strip, the office and <br />facilities area, the Tipple loadout, and Pit 1. <br />As stated above, this follow up inspection will be limited to the 720 Pit area and will <br />focus on Phase I adequacy issues previously identified during the 5/12/94 inspection and <br />in the review process of TR-12. The Phase I follow up inspection is scheduled to occur <br />12:00 noon, June 5, 1995. <br />Please contact me if you have any questions or require more information. <br />Sincerely, ~ <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />Certified Mail li p296 608 606 <br />