My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00938
DRMS
>
Back File Migration
>
Revision
>
REV00938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:35 AM
Creation date
11/21/2007 8:48:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
5/15/1995
Doc Name
720 PIT AREA CONTINUED PHASE I BOND RELEASE INSPECTION KERR COAL CO MARR MINE PN C-80-006
From
DMG
To
OSM
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o! Natural Resources <br />1 31 3 Sherman Sl.. Room 215 <br /> <br />Denver, Colorado 80203 Ih~~~ <br /> <br />Phone: 13031 8663567 I <br />FAX: IJ031 832-8106 <br /> DEPARTMENT OF <br />May 15, 1995 NATURAL <br />RESOURCES <br />Mr. Stephen Rathbun <br />Mr. Henry Austin <br />Office of Surface Mining c ~r~« <br />lames 5. Lochhead <br />Executive Director <br />Albuquerque Field Office <br />505 Marquette Avenue NW o ~i,o~ oi,~ or <br />Suite 1200 <br />Albuquerque, NM 87102 <br />RE: 720 Pit Area, <br />Continued Phase I Bond Release Inspection, <br />Kerr Coal Company, Marr Mine, Permit No. C-80-006. <br />Dear Sir: <br />This notice is to announce the continuation of the Phase I bond release inspection from <br />5/12/94. Individuals present during the 5/12/94 inspection included: <br />Stephen Rathbun Dept. of Interior, Office of Surface Mining; <br />Henry Austin Dept. of Interior, Office of Surface Mining; <br />Jim Perry <br />Randy Price <br />David Berry <br />Bobbie Mobley <br />Josephine Calkins <br />John Wilkes [II <br />Jerry Nettleton <br />George Patterson <br />Dept. of Interior, Bureau of Land Management; <br />Colorado Division of Minerals and Geology; <br />Colorado Division of Minerals and Geology; <br />Colorado State Land Board; <br />Colorado State Land Board; <br />Colorado State Land Board; <br />TerraMatrix; and <br />Kerr Coal Company, Marr Strip Mine. <br />The 5/12/94 inspection focused on backfilling, regrading, and drainage control for the <br />720 Pit and Pit 1 areas. Comments raised by the Colorado Division of Minerals and <br />Geology (DMG) inspectors, have been addressed through technical revision to the <br />mining and reclamation plan (TR-12). Office of Surface Mining (OSM) inspectors, <br />present at that inspection, have argued that Pit 1 reclamation did not satisfy <br />"approximate original contour' requirements. OSM concerns have been satisfied through <br />technical revision (TR-13). Kerr Coal Company anticipates that field implementation of <br />the plans approved through TR-13, will not be completed until the fall season of 1995. <br />As such, Kerr Coal Company has modified their original Phase I request to include only <br />
The URL can be used to link to this page
Your browser does not support the video tag.