<br />PERMIT 79-177, MID-TERM REVIEW <br />MAY 13, 1985 <br />PAGE FIVE <br />behind to assure the establishment of a successful plant cover on <br />the site. In the event that the topsoil has eroded to a depth that <br />revegetation will be delayed, the sites will be backfilled and <br />graded. <br />b. Based on the density and occurrence of rills and gullies on ad- <br />jacent areas, does CYCC propose to identify areas of future <br />reclamation where gully formation would be expected to occur <br />and where gully reclamation would therefore not be implemented? <br />RESPONSE: <br />At the May 2, 1985 Coal Operators/CMLRD meeting in Denver an updated <br />policy for regrading or stabilizing rills and gullies was presented. <br />Based upon this policy, CYCC will formulate and submit when com- <br />pleted, a plan identifying areas of future reclamation where gully <br />formation would be expected to occur. <br />XVII. Bonding -Rules 2.05.4(2)(b) and 3 <br />In the February 3, 1984 midterm response document, CYCC estimated a <br />reclamation cost of $9,884,100.00. That estimate did not include <br />reclamation of the Area 2 pit, In addition, 1,702 acres have been <br />revegetated at Mines No. 1, No. 2 and Eckman Park, but not released <br />from bond. Based on material volumes and assumptions as set forth <br />in the Foidel Creek Permit Application, the cost of reclamation of <br />Pit 2 is estimated to be $905,190.00 (see Attachment A). A cost of <br />$611.00 per acre is applied to revegetated areas not released from <br />bond. Based on calcuiations submitted by CYCC (February 3, 1984), <br />the cost of reclaiming the Area 2 pit, and the cost of revegetation <br />on the 1,702 acres which have been reseeded but not released, the <br />total bond amount required is $12,023,000.00. <br />