Laserfiche WebLink
.~ <br />~ iii iiiiiiiiiiiii iii <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getches. Eaecurive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTO N, Director <br />Richard D. Lamm <br />Governor <br />January 2, 1986 <br />Ms. Rebecca Shea <br />Senior Vice President - Cashier <br />Colorado Bank and Trust Company <br />P.0. Box 60 <br />Delta, Colorado 81416 <br />Re: Succession of Operator - Black Cat Pit - File No. M-78-304 <br />Dear Ms Shea: <br />Thank you for the materials received December 30, 1985. The "Request for <br />Transfer of Mineral Permit and Succession of Operators" form and the <br />"Performance Warranty" form are both properly completed. The Assignment and <br />Indemnification document is also sufficient. We do require one additional <br />form (see enclosed) which is entitled "Financial Warranty: Certification of <br />Deposit". Please complete this form and return at your earliest convenience. <br />Additionally, the Division routinely reviews the total file when a request is <br />received for a succession of operator. In this case, the existing financial <br />warranty is extremely low given 1986 contracting costs for mined land <br />reclamation work. Grading and redistribution of the 6" of topsoil as required <br />in Permit No. 78-304 alone would cost the state approximately $3.000 to $5,100 <br />depending upon equipment used. Please note the following calculations derived <br />from the "Rental Rate Blue Book": <br />Grading/Topsoiling costs <br />(9.9 acres) X (6" topsoil) X ($.38/cubic yard) _ $3,043.36 <br />*($.38) = The cost to move one cubic yard of material using a D-8 dozer <br />in the SW area of the state assuming minimum haul, level ground and 83~ <br />efficiency <br />or \ <br />(9.9 acres) X (6" topsoil) X ($.64) _ $5,125.66 <br />**($.64) = The cost to move one cubic yard of material using a 613B <br />scraper in the SW area of the state assuming minimum haul, level <br />ground and 83% efficiency. <br />Seeding <br />The standard current cost estimate for drill seed application including <br />seed cost, equipment rental and labor averages about $125.00 per acre. <br />The total potential cost for this site is (g.9 acres) X ($125.00) _ <br />$1237.5 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />