Laserfiche WebLink
7. MCC will hydromulch these areas, which secures the mulch with a tackifier. No crimping <br />or netting are required with this technique. <br />8. Representatives of MCC's consultant, Greystone, had discussed these curve numbers with <br />you at length and the curve numbers provided were believed to be those agreed upon in those <br />discussions. MCC will, however, revise this table as required and submit this Table along with <br />revised Table 44 when completed. <br />9-12. No response required. <br />Additional Hydrology Comments <br />1-4. No response required. <br />Please incorporate the March 1994, SedCAD runs in Exhibit 66. <br />6-8. No response required. <br />Bonding <br />1-2. No response required. <br />3. The reclamation plan and cross-sections referenced in the above stability response, should <br />be incorporated in the permit as Maps 58A and 58B. As the bench will be created as a result of <br />the access road loop construction, the area will be reclaimed in compliance with Rule 4.03.2(7). <br />A cubfill balance of 31,000 cubic yards is planned, followed by topsoil cover, seeding and <br />mulching, as usual. <br />Please contact me should you require further clarification or have questions on the information <br />submitted. <br />Sincerely, <br />~~ vv~ <br />Kathleen G. Welt <br />Environmental Supervisor <br />