Laserfiche WebLink
~,~ <br />C~ <br />C~ <br />3 <br />10. In Appendix E, sheet 10 of 10, under TOPSOIL STORAGE, 1.3.1: <br />This is the only place in the document that states 2 feet of <br />topsoil will be stored on out slopes of fill banks at bench.. [1e <br />request this information be included in the pertinent section of: <br />the interim reclamation plan, <br />11 <br />We request that CWI explain in the narrative (Section 2.05.4, <br />Reclamation Plan) exactly what measures will be taken to reclaim <br />East Roatcap Creek (after the area is no longer needed), in the <br />areas of regrading, revegetation, soil replacement, etc. Show a <br />cross-section to include the East Roatcap Creek and Portal Bench <br />entrance road, depicting the final grades of East Roatcap Creek <br />and its environs (similar to Reclamation drawing, Appendix F) and <br />the portal bench proposed construction grades. <br />cc: Mr. R. W. Stucki <br />Colorado Westmoreland Inc <br />P.O. Box 3 1299 <br />Paonia, Colorado 81428 <br />Rick Lawton, OSM <br />Office of Surface Mining <br />Brooks Towers <br />1020 15th Street <br />Denver, Colorado 80202 <br />Randal P. Price <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building I <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Lynn Lewie <br />~~~~~1 <br />:~ <br /> <br />