Laserfiche WebLink
sheet 1 of 2 <br />PermiUjob # : M-1983-102 <br />Abbreviation :none <br />Filename : M102-003 <br />Agency or organization name : DRMS <br />Task # : 003 State :Colorado <br />Date : 03/16/2007 County :Grand <br />User : ESC Site : Thompson Properties <br />Permit or otherjob action :Am-02 <br />Task description :Replace Topso!! <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cos! Bre <br />Scraper work team -Scraper :Cat 631G <br />-Push dozer .Cat D9R - 9SU (2005) <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grade~A <br />-Water truck :~NA <br />CIRCES Cost Estimating Software <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />Utilization-machine : 86 100 NA NA NA NA <br />-Ripper attachment : NA 0 NA NA NA NA <br />Ownerhip cost/hour : $70.85 $64.72 NA NA NA NA <br />OperaBng cosUhour : $98.70 $98.84 NA NA NA NA <br />Ripper op.cosUhour: NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $192.49 $196.34 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $581.33 Support : $0.00 Maintenance : $0.00 <br />Total work team cosNhour : x$81.33 <br />Initial <br />volume: 11,688 CCY <br />Swell Loose <br />factor : 1.115 volume : 13,032 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />