My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-21_REVISION - M1983102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983102
>
2007-03-21_REVISION - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:18 PM
Creation date
11/21/2007 8:48:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
Revision
Doc Date
3/21/2007
Doc Name
Amendment Approval
From
DRMS
To
Thompson Properties
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Esttmatina Software <br />PROJECT IDENTIFICATION <br />Task # : OOZ State :Colorado <br />Date : 03/16/2007 <br />User : ESC <br />County :Grand <br />Site :Thompson PropeRies <br />Agency or organization name : DRMS <br />Permit or other job action :AM-02 <br />Task description : Resh <br />HOURLY EQUIPMENT COST <br />Plt Floor <br />Basic machine :CAT 140H <br />Attachment no. 1 :NA <br />Attachment no. 2 :Mufti-shank ripper <br />Horsepower: 165 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cosUhour : $26.25 NA <br />Grader operating cosUhour : $32.92 100 <br />Ripper operating cosUhour : $0.47 25 <br />Operator cosUhour : $24.47 NA <br />Total unit cosUhour : $84.11 Total fleet cosOhour : 684.11 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 33.72 acres <br />Source of estimated acreage :Operator Estimate <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees' ' at o degrees, Made is perpendicular <br />Effective blade length : 10.40 feet m direcUOn avavei. <br />Width of blade ovedap per pass : 2.00 feet <br />Net grading or ripping width per pass : 8.40 feet " •• width of upper beam on dppiig applications <br />Unadjusted houdy unit production : 1.2727 acres/hour <br />Job Condition Correction Factors Souroe <br />Average site altitude : 8,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (fsh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.0818 acres hour <br />Adjusted hourly fleet production : 1.0818 acres/hour <br />_.. ;: - <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 31.17 hours <br />Abbreviation :none <br />Filename :M102-002 <br />Permitfjob # : M-1983-102 <br />Unit cost : $77.75 per acre Total job cost : x2,822 <br />
The URL can be used to link to this page
Your browser does not support the video tag.