My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00738
DRMS
>
Back File Migration
>
Revision
>
REV00738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:24 AM
Creation date
11/21/2007 8:47:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Revision
Doc Date
10/2/1995
Doc Name
Woody Plant Standard Memo (Faxed)
From
Dan Mathews
To
Tony Waldron
Type & Sequence
TR62
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. OCT. 2 '95 2:04PM DMG,GJCT <br />DIVISION OF MINERAES AND GEOLOGY <br />Department of Natural Nesources <br />(3 t 3 Sherman S[., Room 27 5 <br />Dcns~cr, Cuiorado B020J <br />Phone: (3031 866-3567 <br />fAX: (303) 83217106 <br />DATE: October 2, 1995 <br />TO: Tony Waldron <br />T jI/' <br />FROM: Dan Mathews (/ <br />RE: Hayden Gulch Mine Woody <br />1 303 2410336 P.2 <br />STATE OF COLORADO <br />Plant Standard <br />~~~~~~~~ <br />DEPARTMEIVI' OF <br />NATURAI. <br />RESOURCES <br />Roy Romer <br />Cwernor <br />7~mnc S 1 nrhlwA <br />Execwive Di,ecmr <br />Michael 0. Lrn.a <br />Uiviviun U7nc'ror <br />i met with .john Toolen, DOW Northwest Region wildlife biologist <br />this morning to discuss the alternative shrub standard approach <br />proposed by H-G Coal Company (HG), in their August 7, 1995 <br />preliminary proposal addressed to bob Caskey, DOW Northwest <br />Regional Manager. Mr. Toolen recently accompanied Joe Dudash on an <br />inspection of the reclaimed site, and has spoken to you and <br />representatives of TerraMatrix (consultant to HG) regarding DOW's <br />concerns with respect to shrub establishment and wildlife habitat <br />needs at the Hayden Gulch reclaimed area. <br />The wildlife species of primary concern to DOW is the Columbian <br />sharptailed grouse which utilizes the mountain shrub habitat iIl the <br />vicinity of the mine, and is apparently decreasing across its range <br />in northwest Colorado. Due to the rather limited size of the <br />disturbance and the presence of adjacent corer, the site provides <br />desirable seasonal forage for deer and elk in its current <br />condition, and further mitigation would probably not be warranted <br />based on big game habitat needs. In Mr. Toolen's opinion, the <br />establishment of three to four, 1 acre woody habitat islands <br />associated with spring/seep areas within the grass dominated <br />reclamation would enhance the site's value as nesting and brood- <br />rearing habitat for the sharptailed grouse. <br />With respect to the HG proposal, Nr. Toolen felt that the proposed <br />planting locations were probably appropriate, but the size of the <br />proposed planting sites was probably insufficient to provide <br />significant habitat enhancement. Additionally, he felt that more <br />permanent elk proof fencing would need to be provided to ensure <br />that elk would be excluded from the plantings until the shrubs are <br />well established. <br />The conceptual approach we both felt comfortable with would ba the <br />establishment of a minimum of three, one acre shrub enhancement <br />areas, with a 1000 stem/acre standard applicable to each designated <br />
The URL can be used to link to this page
Your browser does not support the video tag.