My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00605
DRMS
>
Back File Migration
>
Revision
>
REV00605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:58:16 AM
Creation date
11/21/2007 8:47:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
9/16/1998
Doc Name
MIDTERM REVIEW Findings Document
From
DMG
To
KERR COAL CO
Type & Sequence
MT4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section N -Decision to R.~g~.tire Revisions <br />As a result of [his midterm review, the Division will require revision(s) of the permit [o address <br />the following concerns with the currently approved Marr Strip Mine permit application. The <br />Division will require that Kerr Coal Company submit a complete revision application to address <br />the items listed on or before November l6, 1998. <br />I had some difficulty finding where certain of the Colorado regulatory requirements were <br />addressed in the Marr Strip Mine permit application, because it is organized according to the <br />Federal Regulations. Please let me know if I commented on a topic that is already addressed. <br />General <br />1. The introduction of the permit application provides a good history of the operations. An <br />update to the end of this section would be helpful to include mining and reclamation <br />activities that have occurred since August, 1990 when it was last revised. <br />Rule 2.05.4 -Reclamation Plan <br />2. It would also be helpful to update the general description of the operation plan, Section <br />780.11(a) and the reclamation plan, Section 780.18(b) in the permit application to reflect <br />the current conditions. A summary of what activities have occured and the current status <br />of the mine site should be added to these sections. <br />Map 47, Actual Reclaimed Topography needs to be referenced in the updated text. The <br />reclamation timetable starting on page 780-58 which is part of the reclamation plan in <br />Section 780.18(b), needs to reflect remaining reclamation activities. <br />3. Pond G was constructed in advance of future mining that did not occur. This pond is not <br />collecting runoff from a disturbed area. BLM has requested (verbal communication with <br />Jim Perry, August 4, 1998) that this pond be removed. On page 780-9 and 10 it says that <br />all ponds will be completely removed and reclaimed after the disturbed azea served by the <br />pond has been restored. Since this pond does not serve a disturbed area, it can be removed <br />now. A schedule needs to be provided. <br />4. On page 780-12, the permit says that upon permanent cessation of operations, all mine <br />facilities will be dismantled and removed from the site and the areas regraded, topsoiled <br />and revegetated. This has partially occurred, however some facilities are still on site. <br />The fuel storage tanks are still on site, although past inspection reports say they will be <br />removed. There has been talk of keeping the warehouse as a petmanent facility. The <br />permit needs to be revised to accurately reflect what the facility reclamation plan and <br />schedule are. <br />Marr Strip Mine, C-BO-006 7 September 16, 1998 <br />Midterm Review Fourth Permit Term <br />
The URL can be used to link to this page
Your browser does not support the video tag.