Laserfiche WebLink
Response - The sump is an incised structure and is described in the <br />text. During the backfillling and grading operation this sump will <br />be filled in and does not appear to warrant a special bonding line <br />item. <br />7. Also on page 2.05-13(b)(lc) the construction of a small <br />transformer pad next to the preparation plant is mentioned. Do <br />bond monies need to be associated with this structure? <br />Response - The bond estimate has been modified to address <br />demolition and removal of the pad. <br />8. Page 2.05-55(a) discusses the removal of a power line associated <br />with the preparation plant. The removal of this power line was not <br />included in the estimate. Please ask the operator to include the <br />removal of this structure in the estimate. <br />Response - The removal of this power line is addressed in the bond <br />estimate for MR 94-108. <br />DMG Letter of January 12, 1995 responses <br />4. Culverts not identified on Map 24. As we discussed pm the <br />phone, all culverts related to Pond E need to be addressed in this <br />revision. All culverts along the three pond E ditches need to be <br />spotted on Map 24 and all need to be included in Table B of Exhibit <br />8 with the appropriate information. Many are currently not shown <br />on Map 24 and/or not included in the table. Please correct this <br />information. <br />Response - The culverts associated with Pond E are shown on Map 24 <br />and the pertinent information for the culverts is presented on <br />Table B. <br />5. Text does not refer to ditches D-4 and D-5. Ditch D-4 is not <br />included in the text as the response indicates. Please correct <br />this omission. <br />Response - The correct and updated text is attached. <br />6. Text indicating drainage at the stacking tube to Pond F. The <br />text has not been changed as the response indicates. Please <br />correct this omission. <br />Response - The correct and updated text is attached. <br />9. Pond D as-built reference. The Division's understanding from <br />the text and Map 24 is the only change to Pond D from TR-18 is that <br />Pond D will no longer receive underground mine water discharge. <br />References to Pond D receiving mine water discharge (Ex 8-3) should <br />be removed from the text. <br />Response - The above reference was removed from the text. <br />