Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 06/17/2003 <br />User: JOf <br />State :Colorado <br />County :Elbert <br />Site : Patty'S Prt <br />Agency or organization name :DMG <br />Permit or other job action :final reclamation <br />Task description :replace topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D6R - 6S Horsepower : 165 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :NA <br /> Dafa source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $23.05 NA <br />Operating cosUhour : $31.33 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $24.01 NA <br />Total unit costlhour : $78.39 Total fleet cosUhour : x78.39 <br />,: : <br />:: <br />MATERIAL QUANTITIES :; ,; : <br />,,.. <br />Initial Swell Loose <br />volume: 9,580 CCY factor : 1.215 volume: 11,640 LCY <br />Source of estimated volume :calculation <br />Source of estimated swell factor :program <br />HOURLY PRODUCTION <br />Average push distance : 250 feet <br />Unadjusted hourly production : 119.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />4.00 % (i <br />5, 720 feet <br />1,600 Ibs/LCY <br />PermiUjob# : M-1998-103 <br />Abbreviation :none <br />Filename : M103-001 <br />Source <br />Operator skill : 0.75 (av <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.20 (sk <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (fshih <br />Spoil pile : 0.80 (/nd <br />Push gradient : 1.09 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 1.44 (Cat <br />Blade type : 1.00 (S/St <br />Net correction : 0.94 <br />Adjusted unit production : 112.22 LCY/hr <br />Adjusted fleet production : 112.22 LCY/hr <br />_ _...._ <br />J B TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 103.72 Hours <br />Unit cost : $0.699 /LCY Total job cost : .f 8,131 <br />