<br />e~eidsi Plt <br />2°d Adequary Review Response <br />Page 2 of 4 <br /> <br />The phase delineations have been amended to indicate the entire affected areas. They aze as <br />follows: <br />Phase I Mined Acres: 18 Total Acres: 22 <br />Phase II Mined Acres: 11 acres Total Acres: 15 <br />Phase III Mined Acres: 35 acres Total Acres: 40 <br />The Phases and mining limits have also been clearly marked on the Mining Map. <br />The azea to be mined is indicated on the Mining Map by a heavy dashed line. The legend also <br />describes this area as mining limits. Mining will occur only within the interior of each of these <br />clearly marked areas. <br />The permit boundary along the south side of Phase III has been changed to reflect the original <br />permit boundary limit. <br />The ditch within ten feet of the mining limit of Phase II is owned by the property owner <br />Gossney. A compensation agreement is currently being obtained and will be forwarded to the <br />Division prior to any disturbance within 200 feet. <br />The divider between Phase I and Phase I[I will not be mined. This is a change from the <br />previously submitted application. Approximately 20 feet will separate the mining in Phase I and <br />Phase III and as such has been shown on the mining map. <br />Dewatering during the mining phases will occur through pipe that will be located above ground. <br />The pipeline will not affect haul roads or haul equipment. The pipelines will be removed during <br />reclamation. <br />The areas to be mined in each phase aze shown by dashed lines on the mining map. <br />The correct mining depth is as follows: <br />Phase I will be mined at a depth of 19 feet to an elevation depth of 6,738 feet. <br />Phase II will be mined at a depth of 25 feet to an elevation depth of 6,722 feet. <br />Phase III will be mined at a depth of 19 feet to an elevation depth of 6,738 feet. <br />The pond margins as shown on the most recent submitted map are correct. <br />The number of acres to be affected at one time is approximately 20 acres. Topsoil will be <br />salvaged and stored in the delineated stockpile areas as shown on the mining map. The stripping <br />depth of topsoil is approximately five to seven feet. <br />All areas that are mined will be reclaimed and used as reservoir storage. <br />