<br />No change or modification is required for the sediment control systems <br />controlling this area. The runoff from the newly added area will be <br />controlled by the East Buzzard and Coyote drainage systems. Revised <br />pages for Appendix Q, Section II and III are attached to verify that <br />adequate sediment runoff control exists with the current sediment <br />control systems. <br />The addition of mining and topsoil removal acres may affect the 1988- <br />1992 permit term bond. Section 4.0 of this revision discusses bonding. <br />3.0 Map Updates, M10A thru M10D, Map M4. <br />When permit renewal PR-2 was submitted in FEbruary, 1987, the start of <br />the permit term, 1988-1992 was based on the projected location of mining <br />and associated activities at the end of 1987. All pits are on schedule <br />except for Ashmore pit, which is behind schedule. As a result, maps <br />M10A thru M10D and Map M4 need revised to reflect this change. <br />Attached are revised copies of the maps M10A thru M10D and Map M4. The <br />start of the permit term 1988-1992 has been adjusted in Ashmore pit to <br />reflect a actual field locations of mining and associated activities as <br />of December 31, 1987. In addition, these maps reflect the changes that <br />will result from the mining and topsoil removal activities discussed in <br />Section 1.0 and 2.0 of this revision request. Note that there is no <br />change in the boundaries established with PR-2, i.e. limit of <br />disturbance is the same as in PR-2. <br />4.0 Bonding <br />All reclamation costs calculated fro the PR-2 bond amount were based on <br />the worst case year for reclamation requirement s Table3 1.4-14 was <br />used to show regrade and retopsoil acres by year for the permit term of <br />1988-1992. This table showed 1990 as the worst case year. <br />The proposed mining changes in Ashmore and Colt pit plus a change in <br />topsoil stripping in Colt pit affect acre estimates for 1988. In <br />addition, by making PR-2 plans current, such that the plans coincide <br />with actual disturbance at Che start of the 1988-1992 permit term, will <br />affect the acre estimates for 1988 and 1989 bond. <br />Permits maps M10A-M10D and map M4 have been revised to reflect the <br />changes addressed in the prior paragraph. These changes result in <br />revised acre estimates for 1988 and 1989. To evaluate the effect on <br />bond calculations, Table TR-41-1 is attached. This table presents the <br />data from PR-2 table 1.4-14 as compared to the acre estimates resulting <br />from this technical revision. As shown, the year 1990 continues to be <br />[he worst case year for calculating bond estimates. A revised PR-2 <br />table 1.4-14 is attached reflecting the 1988 and 1989 acre estimates. <br />As depicted by this table, no bond increase is needed. Additionally, <br />revised permit Table 3.1-3 is included that presents the approximate <br />yearly disturbance and reclamation acreage by activity. <br />