Laserfiche WebLink
STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 6663567 <br />FA x: 303 632-8106 <br />DATE: March 5, 1990 <br />T0: Stipulation Tracking File; Mt. Gunnison No. 1; C-80-007 <br />FROM: Matthew Hayes <br />RE: Status of Stipulations Associated with Mt. Gunnison No. 1 <br />Permit: C-80-007 <br />OF Cpl <br />tip' ~9 <br />c="ff. ,~Q <br />.~,' 1 <br />. ~ ai:4 <br />. ~~.,r. <br />re'!6 ~ <br />RoY Bome~, <br />Govemo~ <br />Fretl R Bania. <br />Drvis~on Ureaoi <br />All the stipulations imposed on the Mt. Gunnison permit are listed below, <br />followed by a description of their present status, Technical Revision 56 <br />(see cover letter dated October 25, 1989) resulted in the incorporation of <br />most of the outstanding stipulations into the body of the permit application, <br />Stipulation No. 1 <br />NEITHER WEST ELK COAL COMPANY, NOR ANY SUCCEEDIN; OPERATOR OF THE <br />MT. GUNNISON PROJECT'S COAL LEASES AND RESERVES WILL BE PERMITTED TO MINE <br />COAL WITHIN THE MINNESOTA CREEK BASIN, UNTIL MLRD HAS RECEIVED A COPY OF <br />AN ADJUDICATED PLAN OF AUGMENTATION. <br />WECC's response was not considered acceptable. The B seam mine plan proposes <br />mining under the Minnesota Creek Drainage. WECC has provided an adjudicated <br />plan of augmentation (Exhibit 4.9.A.1, Volume 2A). However, Item 54 on <br />page 32 of the plan identifies it as being specific to mining in the F seam. <br />Therefore, the status of the stipulation will remain "future". <br />Status: Future. <br />Stipulation No. 2 <br />THE APPLICANT SHALL CONTINUE TO SUBMI7 TO THE DIVISION, AN ANNUAL REPORT <br />OF INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />REPORT IS TO INCLUDE A MINE WORKINGS MAP SNOWING THE LOCATION AND <br />QUANTITY OF INFLOWS, A TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN <br />THE SOURCE (I.E. FAULT, FRACTURES, ETC), QUANTITY, DURATION, AND QUALITY <br />(I.E. pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS; A TABLE <br />CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, CONSUMED IN 7HE <br />MINE, AND IMPORTED FOR USE WITHIN THE MINE, A MAP SHOWING CURRENT WATER <br />USES, A DISCUSSION OF THE WATER BALANCE WITHIN THE MINE, AND FINALLY A <br />PROJECTION OF HYDROLOGIC IMPACTS OF MINING IN THE UPCOMING YEAR. THIS <br />SHALL BE SUBMITTED NO LATER THAN FEBRUARY 1ST OF EACH YEAR. <br />