Laserfiche WebLink
{~ <br />., <br />~ ~~i iii~i«ii~~u iii <br />MLRB FIINUTES <br />AGENDA LTEM 28 - WRCHE51'ER COLU;9INE COAL COCIPANY. File No. C-014-81 <br />Page 6 <br />Staff presentation was made by Reclamation Specialist, bob Liddle, regarding a <br />request for an informal opinion Erom Ctie Board as [o whether or not [heir existing <br />operations are in or adjacent to an alluvial valley ELoor. "This Item concerns <br />Dorct~estec's Canon City Pline, .tl, located 7!p miles soutliwes[ of Florence. <br />After considerable discussion, it was MOVED that rile Board does not have informatiu~i <br />which would allow it to say [l~at there arc iio alluvial valley floors in the confin~:•: <br />of rile Dorchester Colomine proposed area. SECONDEU and PASSED U[JAIJI;IOUSLY. <br />AGENDA ITEM 29 - CWRCkiES'fER CULUMINE COAL COMPANY, File No. C-015-81 <br />StaEE presentation was made by Reclamation Specialist, Bob I.Lddle, regarding a <br />request Eat an informal opinion from Clie Board as to whether or not their existing <br />operations ace in or adjacent to an alluvial valley floor. This item concerns <br />Dorchester's Fruita Mine wliicl~ is located about ten miles nortliwes[ of Grand Junction. <br />After review by the staff, staff recommends that [fie re is no[ an alluvial valley <br />floor in or adjacent to tl~e Fruita Mine itself. <br />It was h10VED that based on the staff recommendation and rile description of the <br />evidence presented to [l~em that [tie Board issue an advisory opinion that the <br />area surrounding the Dorchester Colomine Coal Company Fruita line does not appear <br />to be in or adjacent to an alluvial valley floor. SECONDED and PASSED UNANIMOUSLY. <br />AGEh1DA ITEM 3U - ENERGY FUELS CORPORATION, Filc tJo. 76-16 <br />Staff presentation was male by Ruclamation Specialist, 806 Liddle, In writing, <br />ATTACNP1EtJT J. This is a request Eor bond release. <br />After considerable discussion, it was MOVED [liar tine Board release Energy Fuels <br />Corporation Erom liability in areas A, B, C, D, E, F and G at their 113 Mine leaving <br />for the time being rile calculation whether specific bond amounts should be returned <br />Co the operator until processing and approval of the re-application under the new <br />Coal Act. SECONDED and PASSED UNANIMOUSLY. <br />AGENDA ITEM 31 - TRINIDAD BASIN t1lhllNG INC., File No. 79-53 <br />Staff presentation was made by Reclamation Specialist, Mike Savage, regarding <br />an amendment to rile mine plan, to enlarge rile permit area [o include sediment <br />control facilities within the permit boundary, to present calculations and map <br />sediment control facilities, to incorporate the railroad loadout facility in <br />Trinidad; this to be an interim approval. This amendment authorizes no additional <br />mining or change in the mining plan. <br />Staff recommends approval for portions of rile amendment regarding the permit boundary <br />change and recommend approval of sections dealing with the loadout facility with one <br />stipulation. Relative to the sediment control facility, the staff continues to have <br />outstanding unresolved concerns. Staff recommends and requests that the Board <br />delegate [o the staff the authority to approve tl~e sediment control system once the <br />remaining concerns are resolved subject to Board ratification. <br />~~ <br />