Laserfiche WebLink
Ei.h1BIT <br />iiinirt~r:1-^' <br />i~iaterial will be excavated from the stream <br />bed of the branch of the F.epublican Fiver. It will <br />then be loaded into trucks, by means of a front end <br />loader, and hauled to the various locations of the <br />current road maintenance. Some material may be <br />stock-piled in the area shown, but generally the <br />gravel will be loaded directly into county dump <br />trucks. <br />!Vo other machinery need be used except possibly <br />a dozer in the reclamatien smoothing process. <br />luny part of the creek bank used for turning <br />and loading will be smoothed and prepared for <br />seeding at time of reclamation. <br />