Laserfiche WebLink
~~ <br />E7:^IPIT - i•iining plan _ Bee narrative <br />attached. <br />1, Datas of .Mining, be~yinninb and ond, <br />rviining will nct begin until pernit is granted. Aug. or <br />J2pt. 19$$. ' <br />It is estimated that the gravel supply will last 20 years. <br />2. Description of depth of top soil & how stored. <br />This is a creek bottom operation. There is no top soil. <br />3. Description of.overburden <br />There is no overburden <br />4• Tkiekness of gravel layer. <br />Testing indicates a gravel layer of from 4'to $'~, <br />5. Description of roads to & frog pit - Show on map - Ex E; <br />Pit area borders on county road V and 13, No haul road will <br />be seeded. <br />6. Show disturbance to land surface.' <br />The ohiy land surface disturbed will be the creek bottom <br />itself . <br />~. Show dimensions of exiatin~ and proposed roads that <br />will be used. <br />None needed. <br />$. Spocify how such water will be used, if any. <br />No water will be used in this operation. <br />9. Describe any ground water and/or the affect. <br />This is a dry creek. The only time. there is any water ~s <br />following a heavy rain. <br />10. Describe if will comply with Colorado YJater Laws. <br />Yes. There will be no conflict. <br />11, Deseribe whether gravel will be processed on site. <br />Gravel will not be processed. "'Used as mined. <br />