My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:14 PM
Creation date
11/21/2007 2:04:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
2/9/2000
Doc Name
FINAL AREA PERMIT VIC ISSUED TO AM SODA P 83-164
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' December 23, /999 ~ • Page 2 <br />' The baseline characterization will be accomplished by water-level and water-quality monitoring in <br />' a network of groundwater wells and surface water stations. The primary objective of groundwater <br />and surface water monitoring during the operations period is to determine if mining has affected <br />' groundwater and/or surface water. If mining does affect groundwater and/or surface water, the <br />effects may be evaluated by comparing commercial operations monitoring data to baseline <br />' monitoring data. <br />Groundwater and surface water data were collected during the operation of American <br />Soda's test mine, which commenced in 1997. The additional baseline monitoring period, as <br />defined by this Plan, commenced in July 1999. <br />The process monitoring section of this Plan was developed using knowledge gained during <br />monitoring of the test mine process. An ongoing process monitoring program has been in place at <br />t the test mine facility since early 1997. Process monitoring for the first 5 years of commercial <br />operations is described in Section 4.0. Process monitoring will begin once commercial operations <br />commence. <br />Subsequent monitoring plans applicable to the 5-30 year phase of commercial mining will <br />' be developed prior to mining in those areas and will use this Water Monitoring Plan as an outline. <br />Monitoring requirements may be modified, as appropriate, in consultation with the regulatory <br />' agencies. <br />1 <br />t <br /> <br />1 <br /> <br />1 <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.