My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:14 PM
Creation date
11/21/2007 2:04:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
2/9/2000
Doc Name
FINAL AREA PERMIT VIC ISSUED TO AM SODA P 83-164
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' December d3, l999 <br /> <br />1 <br />1 <br /> <br />1 <br />1 <br />it <br />i~ <br />I1 <br />I' <br />I' <br />I' <br />I' <br />I' <br />I1 <br />I' <br /> <br /> <br />American Soda, L.L.P. <br />Yankee Gulch Sodium Minerals Project <br />GROUNDWATER, SURFACE WATER, AND <br />PROCESS MONITORING PLAN FOR THE <br />YANKEE GULCH SODIUM MINERALS PROJECT <br />1.0 INTRODUCTION <br />Puye l <br />This document is a comprehensive monitoring plan for the American Soda, L.L.P. <br />(American Soda) Yankee Gulch Sodium Minerals Project (Yankee Gulch Project). This <br />monitoring plan, the "Groundwater, Surface Water, and Process Monitoring Plan (Water <br />Monitoring Plan) for the Yankee Gulch Sodium Minerals Project," was prepared in consultation <br />with the Bureau of Land Management (BLM), the Environmental Protection Agency (EPA), the <br />Colorado Division of Minerals and Geology (CDMG), the United States Geological Survey <br />(USGS), and Rio Blanco County. These agencies required the development of this plan to support <br />their respective permitting actions and regulatory requirements. The permits that incorporate this <br />Water Monitoring Plan (or portions of the Plan) are listed below. <br />A~ency <br />BLM <br />EPA <br />CDMG <br />Rio Blanco County <br />Permit <br />Commercial Mine Plan and EIS <br />Class III UIC Permit <br />112 Reclamation Permit <br />Special Use Permit (SUP) <br />This Water Monitoring Plan includes groundwater and surface water monitoring for the <br />Piceance Site (solution well field and upper plant) and the Parachute Site (lower plant). It also <br />contains a process monitoring section for mining operations at the Piceance Site. <br />The groundwater and surface water monitoring programs in this Plan include two <br />monitoring periods: the baseline period and the first 5 years of commercial operations (operations <br />period). The objective of the baseline period is to establish recognizable trends in water quality, <br />such that any deviation from the established characteristics is recognizable. Established trends <br />will be developed over a 5-quarter period, prior to startup of commercial operations. The <br />5-quarter baseline period was initially developed in order to comply with CDMG requirements, <br />but was later adopted by the other agencies with jurisdiction over the Piceance Site operations. <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.