My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31518
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:11 PM
Creation date
11/21/2007 1:51:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Hydrology
Doc Date
12/29/1998
Doc Name
4TH QUARTER 1998 Inspections
From
GREAT DIVIDE ENGINEERING & SURVEYING
To
ENERGY FUELS COAL INC
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_~. ~ ~ o o ~.,, <br />1126 MAIN STREET (719) 275-8881 <br />CANON CITY. COLORAD081272 <br />Energy Fuels Coal, Inc. <br />Mr. Alan Weaver <br />Southfield Mine <br />1190 County Road 92 <br />Florence, CO 81226 <br />RE: CERTIFICATION OF FRESH WATER IIvIPOUNDMENT POND NO. 3, <br />SOUTHFIELD MINE, FLORENCE, COLORADO (4th Quarter, 1998) <br />Dear AI; <br />On December 29, 1998, an inspection was conducted on the Fresh Water <br />Impoundment Pond No. 3 currently in place at your Southfield mine. The inspection was <br />performed by myself, John Effinger III, a registered professional engineer in the State of <br />Colorado since December, 1975. I have experience and knowledge in the design and <br />construction of dams, drainage control, hydrology and structures; including experience in <br />portions of the permitting process of coal mine facilities and permit compliance. <br />The purpose of this inspection and certification was to check for structural <br />weakness, erosion, other hazardous conditions and identify required maintenance and to <br />satisfy the requirements of Rule 4.05.9 (l3) of the Colorado Mined Land Reclamation <br />Board for Coal Mining. In addition to the on site inspection referenced above, actions <br />taken in preparing this certification included review and discussion of applicable mine <br />maps and state regulations with yourself. <br />Said inspection was performed on a cool (53°), mostly sunny Tuesday morning by <br />myself. Most of the site was traversed with a four wheel drive vehicle with frequent stops <br />and hiking trips around the pond. The following is a statement of my professional <br />observations and conclusions from this inspection: <br />The entire impoundment was examined for structural weakness, erosion, tears to <br />hypalon lining and other hazardous conditions; none were found. <br />Existing water level was about 5'/ feet below maximum level line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.