Laserfiche WebLink
<br /> <br />COLORADO DEPARTMENT OF HEALTH, Water Quality Control Divisic <br />Renewal Permit Rationale - Page 3. Permit No.: COG-350000. <br />II. Permit Changes (continued) <br />Other chanties: The boiler plate language in Part I. Section C., and Part <br />II. is being revised to reflect the more condensed lan~uage currently <br />used in individual permits. there changes were necessary to reflect tie <br />differences between general permit requirements and iriividual permit <br />requirements, such changes have also been made. <br />No other significant changes are being made [o this general permit. <br />III. Reporting <br />There have been occasions where specific permittees have not properly <br />.followed [he Noncompliance Notification Requirements specified in Part <br />II.A.3. of the permit. Where a request for relief from total suspended <br />solids and total iron and/or settleable solids limitations is desired, <br />the permittee must also submit the documentation specified under Part <br />I.B.l.d) - Burden of Proof Requirements. Failure [o do so may result in <br />enforcement action and/or revocation of authoritacion to discharge under <br />the general permit. <br />IV. Whole Effluent Toxicity (WET) Testing <br />Section G.9.7(2)(a)(i)(A) of the Regulations For the State Discharge <br />Permit System 6.1.0 (SCCR 1002-2) exempts facilities certified under U~is <br />general permit from WET testing requirements. , <br />V. Antidegradacion <br />The discharges certified under this permit are not reviewable waters <br />pursuant to section 3.1.8(3)(a) of the Basic Standards and Methodologies <br />for Surface Waters 3.1.0 (SCCR 1002.2). <br />Jon ~. Kubic <br />January 16. 1992 <br />VI. public Notice Comments <br />Verbal Comments were received by E?.4 legion VIII. Their primary concecn <br />related co [he compliance dace for construction and/or.rela[ed <br />activities. The draft permit stated chat this dace ws three years after <br />the effective date of the permit. Ic was the Division's intention to <br />scare that attainment of operational level would occui as soon as <br />possible, but in no event later than three years after the permit becomes <br />effective. The final permit will clarify this co indicate chat the <br />Division will permit reasonable timetables for conscrUCtion with <br />aporon riate completion daces; but, the latest date acceptable for <br />completion will be June :0, 1995. .4 long cons truct=o~ schedule will :e <br />aoproved only ii maior construction _~ required. The~Division will <br />ensure that no construction ~chedu!e 's axcessi:•e!•~ ~ ng. <br />