My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31392
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:06 PM
Creation date
11/21/2007 1:41:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
6/25/1992
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM COG-850017
From
CDOH
To
RICHARD G ATKINSON
Permit Index Doc Type
NDPES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'.. <br />•~ . <br />COLORADO DEPARTMENT OF HEALTH, Water Quality Gontrol Division <br />Renewal Permit Rationale - Page 2. Permit No.: COG-850000. <br />II. Permit Changes (continued) <br />BMP's also include treatment requirements, operating procedures, and <br />practices co control plant site runoff, spillage or leaks, sludge or <br />waste disposal, or drainage from raw material, intermediate and finished <br />product storage. Pollution prevention (incorporating waste minimization) <br />is an essential part of best management practices. The permittee must <br />look at all phases of the operation to determine what changes could be <br />made that would result in a lower consumption and/or disposal of <br />pollution-generating materials, as well as minimizing exposure of <br />pollutants to stormwater. Such efforts often result in greater profit to <br />the permittee and less pollution of the environment. <br />The mechanism for implementation of stormwater BMP requirements within <br />this permit shall be the stormwater Management Plan (SWMP). <br />The permittee will be required to develop and implement a SWMP plan. <br />Some activities required under this plan may already be in place. <br />However, the SWMP plan will require the permittee co coordinate these <br />activities with any necessary new activities in an orderly manner so that <br />the result is the reduction or elimination of pollutants reaching state <br />waters from areas rot limited by effluent limitations. An added benefit <br />may be a reduction of pollution reaching other media, such as the air or <br />hazardous waste disposal sites. In fact, the permittee is encouraged to <br />srrive for this overall goal. Where the reduction of water pollution <br />only results in the increased pollution of other media, there is no net <br />benefit Co the Pnvironment. <br />The permittees certified under this permit shall be required to submit a <br />SWMP to the Division for review withir. six months from the date the <br />certification is issued. The requirements of the plan do not specify the <br />exact pollution control facilities that the permittee must construct. <br />Instead, the plan allows for creativity on the permittee's part, as long <br />as the goal is achieved. Each permittee will need to determine what <br />controls are necessary at the specific site, Then, the permittee will <br />need co develop a plan for the timely execution of these controls. L~-here <br />construction is necessary, the plan shall include a schedule detailing <br />the milestones involved with such construction. As necessary, elements <br />of the plan may require prior approval from the CMLRD. <br />The plan shall include a statement signed by top management in which they <br />affirm that compliance with the plan shall occur. Also, it shall provide <br />for updates where [here is a change in operac'_on =hat •+ill or may result <br />in a change in the quality of pollutants addressed by this plan, or if <br />the plan is shown co be ineffective in achieving the specified goals. <br />The plan, once submitted, will be incorporated into the permit and its <br />implementation will be considered a permit requirement. Failure to do so <br />could result in enforcement action. The plan shall remain in effect as <br />long as the facility is regulated by a CDPS permit. The permittee will <br />be expected co certify on a yearly basis that the olan is being <br />implemented as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.