Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM ,. <br />Pond GOLDEN EAGLE <br />005 <br />NPDES No.. <br />Date of Inspection °I-27~5`~ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: xcellent Moderate, tsw, Poor <br />2. Erosion forcing gullies: Extensive, 9asw, Very law, lion <br />3. Is wave action causing erosion: <br /> On the upstreec embankment? Yea No~_ <br /> At the principal spillway inlet? lfes No~_ <br />4. ,Erosion of the downstream toe of the embankments' Yea No X <br /> The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea _ No X If yea <br />could this seepage cause potential instability? Yes No~_ <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. Ia the principal spillway system in working ordex•T Yes~_llo <br />2. is the inlet free of debris and restrictive saterial7Yes~No <br />3. Ia the discharge outlet free of restrictive material? Yes~_No_ <br />4. Is erosion occurring at the dischazge outlet? Yes No~_If ~ <br />yes, <br />•.,,~~ evaluate the severity: Extensive. Moderate Just starting None <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yea X No <br />` 2. Does it appear as if the emergency'spillway has discharged water <br />since the last inspection? Yes No~_ <br />3. Ia erosion occurring nt any section of the emergescy spillway? <br />Yes Nom, Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />Yea~No~C,_ Ii yes, <br />explain: ~ <br />';..;:' Please add any special comanta concerning potentially dangerous <br />problems on the beck o! this sheet. <br />Inspector__ _ <br />