Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond GOLDEN EAGLE NPDES ro,_004 <br /> <br />Date of Inspection ~•1~s,M ' <br />t <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellen Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, 3osw, Very Few, ones <br />3. Ia wave action causing erosion: <br />On the upstream embankment? 7I'es No~(_ <br />At the principal spillway inlet? Y'ss No_~_ <br />4. Erosion of the downstream toe of the embnnkment7 Yee No~_ <br />'The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No~_ If yea <br />could thin seepage cause potential instab111ty1 Yes No~_ <br />Explnin• <br />PRINCIPAL SPILLMAY <br />1. Is the principnl spillway system in working order? Yes~_!fo <br /> <br />2. <br />~ <br />is <br />the <br />inlet free <br />of debris <br />and <br />restrictive <br />material?Yes~No <br />, <br />3. is the discharge outlet free of restrictive material? Yes~No_ <br />4. Is erosion occurring at the discharge outlet? Yes No~i_If <br />yes, <br />?i evnluate the severity: Extensive. Moderate Just starting one <br />E,M~RGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yes~_No <br />2. Does it appear as if the emergency'spillway has ~dischnrged water <br />since the last inspection? Yes No~_ <br />3. Is erosion occurring at any section of the emergency spillwayT <br />Yea No~_ Describe the <br />extent <br />t <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />Yes No_~ If yea, <br />explains <br />~;,:' Plense ndd any special comments concerning potentially dangerous <br />problems on the beck of this sheet. <br />Inspector /~„/ ~,.~~n..~.~. <br />