Laserfiche WebLink
The contractor i:, running about <br />°1 traim a d:n' into the tunnel, <br />pouring ~(ID ft. of the B-in. slab dur- <br />ing the day shift ti++'Ine and grace- <br />vard shifts clean the tunnel floor, <br />place gravel inhere necdetl, install <br />d aria lines ana shit, the roil +vhere <br />neccssarv to briuq it up to grade. <br />1'he preparatinu a~urk and place- <br />ment is carried ou: in aimilar sec- <br />tions. The trrnpoi,u ~~ hnux•I driving <br />track is torn out .•a.6 night and the <br />entire prep;u~.rlinn npcr;rtion cunv <br />plated more ar Icss in lhr clear. To <br />brid;c the Stlfl-ft. [;, p +cithrnrt tem- <br />pnr:uy track. Drano installed a 550- <br />ft. cnncevur which carries the c~n- <br />crete front train Gr :+oreed nt a speed <br />of 70U fpm. It hikes only' 5 olio. Gr <br />enrply a hco c.rr frail i. The agitator <br />cars rlo not dump directly auto the <br />Lmg conveyor but onto a (i.5-ft. pigg}•- <br />haek. clrv;din[; cnuvevor. The e'hnle <br />conveyor system is rail-nano dcd ^nd <br />operates nn a unit •.vith the pa+iug <br />Gain. It iv pulled f~nvard by moons <br />of hcu rviuchcs. <br />The pacing screed is aprippc•d +vith <br />vibratore and 5l rikc-off bar. Thr con <br />Crete eunu•s olf the :~uncecor ;uxl into <br />a 5-yd. hopper front ++'hicb it flu+vs <br />continuously oidn the prepared hnsr. <br />T+vo augers niounled dirccth' behind <br />move the enncn•4~ to the sides of the <br />lCi-ft.-+cide slab. <br />The ++iring for the train enutrul <br />system, which +rill ope; :tie the ore. <br />trains aulnmalic3lly, reyuiies four <br />con[inuons ernnycs in the surface of <br />the invert shit, plus block-outs fm' <br />ground harncs:: ryrrv 'Ott ft The <br />enun'rs are formed simple bt' means <br />of ,'G-in. by `.„-in. h;rrs uunurtc•d on <br />the sicced. Othrnvise the slab re- <br />gnires no surf;icr treatment. <br />The rail Iaging opcratiun mu+es <br />just ,boot as .vnoothh•. The rails are <br />being placed in cantinunns lrn,gths <br />and on bnh~l rubber pads 6r cushion <br />train movc•mrnt. Special lighhceight <br />templates +vere dcsiGneil fur rlrilline <br />bolt holes in the concrete for the <br />rail fasteners and other rigs for in- <br />sertine the bolts precisrh into place. <br />Plane for the hvo srh of tracks calf <br />for si.c anchor-bolts evcrv tin. (t. <br />Using the ?d-it.-tan,, template, a crew <br />of sis men can drill the 5-in. holes <br />at the rate nl 1(1011 ft. per shift. <br />]3efine placing the ]S-in. bolts, <br />S in. lone, the +carl:men are reyuircd <br />to clean out th~~ hole, and insert <br />grout Anoth~=r sp=aial template is <br />emplm'rd to iuserl the halts r:giid- <br />ly. Then the craw behind installs <br />the butyl rubber rail pads ^nd the <br />^nele. steel clips +ehich hol[l the rail <br />firmly in place. Lacing the r,iil is <br />accomplished by means of a custum- <br />designcd thu~uder. As this machine <br />nun'es do+cn the invert, the rail pass- <br />im; through it is lilted tram [he nut- <br />sic.c curb :md nmecd o+'er and doo'u <br />to its specified alignment The rig <br />handlos :dl four rails sinndtonrnusl+• <br />so that the rail is prccisrly pusi- <br />tinued on the roil pads fur both sets <br />of tracks i~r unc pass. A final crcx' <br />fastens it into place 6v Wrvpiing <br />eL i+cn the nuts un the bolts holding <br />th-~ anchor clips. <br />Tu obtain the invert finish grade <br />desired, ^ suvey party u'urk; :. <br />mi. ahead of the pacing train, direct- <br />ing the shimming of the rail where <br />nccrssary. Then uu the ernveroard <br />shift preceding cnncrrtr placenicnt, <br />another party re-checks the rail grade. <br />Althuneh actual pacing and rril- <br />hr}-in; rnnre ;tluug in an impressice <br />pruductiuu-liuc sh~lq the prepara- <br />CONCRETE MOYF.D oN The feeder bel+ and on}o The SSD-ft,.long conveyor for <br />delivery to the nevi secTion of concrete work. Drano modified ifs batch plant #o <br />produce a }oral of 100,000 cu.yd. for }he invert. <br />PAVING SCREED, equipped wiTh vibrators and strike-o8 bar, dis}ribufes con- <br />cnate across inner#, Three shifts work 24 hr. a day To compleTe }he 9':': mi. projecT. <br />