Laserfiche WebLink
The pond was in good working order prior to the event and was last clean-out in April of <br />1998. The pond was surveyed for sediment accumulation on January 2, 2003. "I~he <br />survey indicated that the pond was within design capacity at time of September event, <br />but is approaching the clean-out requirement. (Pond clean-out was already scheduled for <br />January 2003 and will be completed prior to resumption of mining in February/March <br />2003). <br />Copies of laboratory analysis for both the August and September sampling periods are <br />enclosed. Should you have any questions or need additional information, please let me <br />know. <br />S~erely, <br />Ronald Thompson <br />Consultant to Picketwire Processing <br />Attachments <br />cc: U.S. Environmental Protection Agency <br />Water Management Division <br />Compliance Branch 8 WM-C <br />Denver Place, Suite 500 <br />999 ISib Street <br />Denver, CO 80202-2405 <br />Mr. Kent Gorham <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203-2273 <br />