Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />June 2005 Monthly Report <br />Page 3 <br />Table 2 -June 2005 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piewmeter Date Depth to Water <br />feet Total Depth (ft) Volame of <br />Water ft <br />P10 6/29/05 57.42 58.30 0.88 <br />Pll 6129105 41.24 41.80 0.56 <br />P12 6/29/05 4t.59 41.71 0.12 <br />P13 6/29/05 40.91 41.34 0.43 <br />P14 6/29!05 41.24 0.00 <br />P15 6/29/05 41.10 0.00 <br />During the month of June, no water treatment plant sludge management was conducted during the <br />month. Table 3 below provides the water treatment plant sludge management for 2005 calendar <br />year to date.. <br />Table 3 -Water Treatment Plant Sludge Management Yeaz to Date <br />DATE QUANTfI'Y MANAGEMENT <br />MARCH 2005 392.5 TONS Sludge transferred from drying pad to tailings <br />impoundment. <br />MAY 2005 Stodge pumped from Pond #3 to drying pad. <br />Should you Dave any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 837-5852. <br />i ere! <br />olio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />file <br />