Laserfiche WebLink
,_ <br />Battle Mountain Resources lnc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />June 2005 Monthly Report <br />Page 2 <br />Table 1-June 2005 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 6/29/05 44.39 <br />M-6 6/29/05 <br />M-7 6/29/05 <br />M-8 6/29/05 <br />M-9 6/29/05 141.87 <br />M-10 6/29/05 25.63 <br />M-11 R 6/29/05 43.01 <br />M-12 6/29/05 179.08 <br />M-13 R 6/29/05 130.42 <br />M-14 6/29/05 135.96 <br />M-15 6/29/05 82.58 <br />M-16 6/29/05 22.40 <br />M-19 6/29/05 25.03 <br />M-21 6/29/05 18.33 <br />M-22 6/29/05 16.69 <br />M-26 6/29/05 15.83 <br />M-32 6/29/05 41.24 <br />M-33 6/29/05 47.39 <br />M-34 6/29/05 22.51 <br />BF-4 6/29/05 25.20 <br />BF-6 6/29/05 30.88 <br />LS-1 6/29/05 <br />LS-2 6/29/05 <br />LS-3 6/29/05 <br />LD-1 6/29/05 D <br />LD-2 6/29/05 <br />LD-3 6/29/05 <br />Table 2 -June 2005 Tailing bisposal Area Piewmeter Depth to Water <br />Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water h <br />P6 6/29/05 72.46 0.00 <br />P7 6/29/05 92.30 92.50 0.20 <br />P8 6/29/05 96.77 97.51 0.74 <br />P9 6/29/05 71.73 72.30 0.57 <br />