My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30939
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:54:43 PM
Creation date
11/21/2007 1:00:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977325
IBM Index Class Name
Hydrology
Doc Date
5/3/1994
Doc Name
FINAL PERMIT COLO DISCHARGE PERMIT SYSTEM STORMWATER CERTIFICATION CO COG-500957 CHEROKEE PIT
From
CDOH
To
ADIENCE INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 12 <br />Permit No. COG-500000 <br />J ). MOMTORING AND REPORTING <br />~/! 3. R~rtin¢ of Data -Process Water Discharners <br />i <br />A signed copy of the report forms outlined in paragraphs a and b, below, shag be subvti[ted to each of the following <br />addresses: <br />Colorado Department of Health <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80222-1530 <br />Attn: Permits and Enforcement <br />U. S. Environmental Protection Agency <br />Water Managemtot Division <br />999 18th Street, Ste. 500 <br />Deaver, Colorado 80202-2466 <br />Attrt: NPDES Branch, SWM-C <br />All reporLS required for submittal shall be signed and certified for eccurecy by the permittee. (See Part I.D.10 of the <br />permit.) <br />a. Quarterly Report -Process Water <br />For facilities allowed to discharge process water, reporting of the data gathered in compliance with Part I.B.3.a <br />shall be on a quarterly basis. <br />Monitoring results obtained during the previous 3 months shag be summarized and reported oa Division <br />approved Discharge Monitoring Repoli forms (DMRs), postmarked ao later than the 28th day of the month <br />following the completed calendar quarter. For example, for the 1st quarter (January, February, and March) the <br />quarterly report must be received at this office postmarked no later than April 28. If no discharge occurs during <br />the reporting period, "No Discharge' shall be reported. <br />b. Annual Report -Process Water <br />For facilities not allowed to discharge process water (see Part I.B.3.b of the permit), a report on whether or not <br />a discharge of process water has takes place at the facility is required, in letter form, on an annual basis. The <br />report shall cover October 1 through September 30 of each year, and will be due to the Division by the <br />following October 28, beginning with the first year or partial year of permit coverage. The Division reserves <br />the right the require additional information its the report, oa a case-by~ase basis, as needed. <br />4. Reportinz of Dala - Stormwater Discharners <br />a. Annual Report - SWMP <br />The permittee will be required to submit an annual report, covering lanuary 1 through December 31 of each <br />year, on the overall compliance with the SWMP. The annual report will coataitt, at a ptinimum: <br />1) Name of permittee, address, phone number, end permit certification number. <br />2) A report on the facility's overall compliance with the SWMP. <br />3) A summary of each comprehensive stormwater facility inspection made, including date, findings, and <br />action taken. <br />4) Results and interpretation of any stormwater monitoring performed. <br />The annual report will be due to the Division oa or before February 15 of each year, after the first full year of <br />coverage under the permit. The exact due date for the permittee's first annual report will be listed is their <br />permit certification. In ao case will m mnual report be due before February 15, 1994, unless specifically <br />
The URL can be used to link to this page
Your browser does not support the video tag.