Laserfiche WebLink
<br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: None ~ 6¢ pi ryLe~` <br />Inspection Period: Third Quarter 2003 <br />Inspection Date: 09/30/03 <br />General Descript(ioyn/~~ or Reference( to Site Plan: ~- ~y <br />-~t}-C. <j /~ 2A-a ` ~ ~drr rX- S I~C.S r qK~//// ~y CM t o-l in I~KN•9}/ -f~-SP<~i WCCK~T/"vs+~ <br />KKR ~"Cf~F^- CB~J~o.A J~CQ- /~/~8+/~ q,/ K..cQ ~ QC~~-6~ r0 ~ re~~ <br />Con ~~/ `j <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent Moderate ew Poor <br />2). Erosion forming Gullies: Extonsive ome Few None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Yes <br />No <br /> <br />4). Erosion of the downstream toe of the embankment? Yes No y <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No ~_ <br /> Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />MSHA Qualified Impoundment Inspector <br />~r~' r~ o ~ 3 <br />Dam <br />No <br />