Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: None ,QpA}- 5 ~~,.~ ~„ ~, <br />Inspection Period: Third Quarter 2003 <br />Inspection Date: 09/30/03 <br />General Description or Reference to Site Plan: <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent Moderate Few Po r <br /> <br />2). Erosion forming Gullies: Extensive Some Few None <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes <br />4). Erosion of the downstream toe of the embankment? Yes ~o <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br /> Could this seepage cause potential instability? <br /> <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />Explain: <br />OTHER OBSERVATIONS: ~/u1~/t- G./~ ~~j^~ . <br />MSHA Qualified mpoundmei Inspector <br />~~ ~o z~3 <br />Date <br />