Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Gr/ee-~ ~df l~v' ~~ ~Jn~i~~~n1 v`~-'I ~'n=ti r" ~ <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2005 <br />Inspection Date: 03!17/05 <br />General Description or Referencento Site Plan: n f- rte- [~ ,[ <br />~. t S ca„`f a~ N rrt e;,,~ /.~~s r ~, /~ e s <E~zS'79 c,'/ 7L-Cy.¢~ r~C D lr/ts l /t'F,~{I~A- <br />U-F` 1 ~h <~/ -fYYJN'~ (~-aJL ~~~cf ~P''IGUS~ ///'t'n <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent tV~lod_era~ Few Poor <br />2). Erosion forming Gullies: Extensive Some O=ewl None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes ~No <br />4). Erosion of the downstream toe of the embankment? Yes No ~~ <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No ~ <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />~ Yes <br />Explain: Nt ~,_~(Icw~e~.~ i_k ~ l r; ~ rK <br />OTHER OBSERVATIONS: <br />I n 5 Ovfr .KAU-~.- <br />L <br />MSHA Qualified Impo ndment Inspector <br />3~~7~d~ <br />Date <br />t/ <br />