Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk /`diacl <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2005 <br />Inspection Date: 03/17/05 <br />General De/scription or Reference t~Jo Sit Plan: <br />PSG p ~ e~ r~ GIi ~~ ..~r~. <br />c~K.lrlr~-+% ~' 2Cr `NG'I utG/ G'LJcvCL^ <br />EMBANKMENT <br />1}. Adequacy of the vegetative cover: Excellent <br />2). Erosion forming Gullies: Extensive <br />~~kt,-1 t(,/LC~y~GI L2tX~Ci1„IC~-~-•-~•j <br />/1 J/ ~ <br />Moderate ew Poor <br />Sorne ew None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes <br />4). Erosion of the downstream toe of the embankment? Yes No f/ <br />Cause of erosion can be attributed io: <br />5). Is seepage occurring through the dam? Yes No G~ <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />N ~~lU <br />SHA Qualified Impound nt Inspector <br />3 l/7 ~4 ~" <br />Date T~- <br />N o ~~ <br />