Kim Edwards
<br />South Platte Combined Replacement Plan
<br />October 23, 2007
<br />Table 2
<br />Page 2
<br />Sfte Name Location
<br />Teti Pit Sections 19 and 20, T2S, R67W
<br />North Dahlia Pit Sections 19 and 20, T2S, R67W
<br />Jeronimus Pit Section 16, T2S, R67W
<br />Hazeltine Pit Section 9, T2S, R67W
<br />Bri hton Pit Sections 14 and 23, T1S, R67W
<br />Tucson South Pit Sections 1 and 12, T1S, R67W
<br />Tucson Pit Section 1, T15, R67W
<br />Wattenbe Pit Sections 25 and 36, T1 N, R67W; Section 30, T1 N, R66W
<br />Platte Valle Pit Section 30, T1 N, R66W
<br />Distel Pit Sections 7, 8, 9, 17 and 18, T2N, R68W
<br />Tull Pit Sections 9, 16 and 17, T2N, R68W
<br />Ste ner Pit Section 33, TBN, R69W
<br />W.W. Farms Pit Sections 32 and 33, T6N, R66W
<br />F-Street Pit Sections 34 and 35, T6N, R66W
<br />Loloff Pit Section 4 T5N R65W
<br />East 8th Street Pit Sections 4 and 9, TSN, R65W
<br />The required fee of $4112 (16 sites x $257fsite renewal fee) has been submitted.
<br />The Applicant previously included the Lawrence Wash Plant, Fulton Lakes and Larson Pit in
<br />this plan approval. Those pits have been removed from this plan for the following reasons:
<br />Lawrence Wash Plant - In 2006 the lake was backfilled and Aggregate fully
<br />augmented all remaining stream depletions resulting from previous mining activities.
<br />Thus, there is no longer any out-of-priority depletions resulting from operations at
<br />the site.
<br />Fulton Lakes -Aggregate has completed mining and reclamation at this site and
<br />has conveyed ownership of the site to the City of Thornton. Reclamation of the site
<br />included completion of a slurry wall liner. According to Aggregate all lagged stream
<br />depletions resulting from previous mining activities have been replaced, therefore,
<br />there is no longer any out-of-priority depletions accruing to the river as a result of
<br />past operations at the ske.
<br />Larson Pit -The landowners have assumed augmentation responsibilities for this
<br />site and have submitted a separate renewal request for the site. That SWSP
<br />request was approved on May 30, 2007.
<br />Regular mining operations are currently occurring at the East 8" Street Pit, WW Farms Pit,
<br />Distel Pit, Hazeltine Pit, Brighton Pit, Tucson Pit, and Wattenberg Pit. Depletions resulting from
<br />evaporation and mining operations at the sites are replaced under this plan.
<br />Mining at the Tucson South Pit and Tull Pit will not begin until after 2007.
<br />Aggregate has completed mining at the F-Street Pit and is continuing with reclamation
<br />activities.
<br />Mining and reclamation of the Teti Pit is complete leaving exposed ground water requiring a
<br />permanent plan for augmentation. Aggregate is currently working towards filing an application for
<br />a plan of augmentation with the water court.