My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO30670
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO30670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:49:20 PM
Creation date
11/21/2007 12:41:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999021
IBM Index Class Name
Hydrology
Doc Date
10/23/2007
Doc Name
Combined Replacement Plan
From
OSE
To
Applegate Group, Inc
Permit Index Doc Type
DMG Sampling
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />eS-~' <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department or Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303)866-3581 <br />FAX (303) 666.3589 <br />hllpl/www.water. st~te.rA. us <br />Kim Edwards <br />Applegate Grou~, Inc <br />1499 West 120 Avenue, Suite 200 <br />Denver, CO 80234-2759 <br /> c <br /> ~ <br /> t <br />.,r . <br />October 23, 2007 RECEIVED aiii Rm«, ~,. <br />~ <br />001 Govem« <br />~ ~ ~ 2 Hartle D. Sherman <br />Division or tteciamation, E><eraitlve Dlrocr« <br />Mining and Safely rvacan0 <br /> State Engineer <br />RE: Aggregate Industries South Platte Combined ReDlacem_ent Plan <br />Water Division 1, Water Districts 2, 3, 5 and 6 <br />Approval Period: January 1, 2007 through December 31, 2007 <br />Contact phone number for Ms. Kim Edwards: 303-452-6611 <br />Dear Ms. Edwards: <br />We have received the January 19, 2007 letter requesting renewal of a substitute water <br />supply plan ("SWSP") to cover depletions caused by gravel mining operations at multiple mine sites <br />operated by Aggregate Industries ("Aggregate" or "Applicant") along the South Platte River <br />mainstem, Upper Poudre River (headwaters to Timnath Reservoir Inlet), Lower Poudre River <br />(Timnath Reservoir inlet to the confluence with the South Platte River) and St. Vrain River. This <br />plan proposes to replace depletions resulting from current and past mining at the nineteen sites <br />specified in Table 1 below: <br />Table 1 <br /> <br /> <br />Site Name <br /> <br />Stream Reach <br /> <br />DMG # <br />Previous <br />A royal <br />Current Well <br />Permit No. <br />New Permit <br />Re wired Exposed <br />Surtace <br />Acres e <br />Teti Pit South Platte M-99-090 11/14/2006 53648-F No 7.85 <br />North Dahlia Pit South Platte M-94-093 11/14/2006 None Yes 13.90 <br />Jeronimus Pit South Platte M-75-039 11/14/2006 63281-F No 9.30 <br />Hazeltine Pit South Platte M-04-031 11/1412006 63224-F No 1.30 <br />Bri hton Pit South Platte M-77-436 11!14/2006 56993-F Yes 42.20 <br />Tucson South Pit South Platte M-04-044 11/1412006 None No 0.00 <br />Tucson Pit South Platte M-91-140 11/14/2006 56829-F No 4.90 <br />Wattenber Pit South Platte M-01-008 11/14/2006 62025-F Yes 15.0 <br />Platte Valle Pit South Platte M-89-120 11/14/2006 55585-F Yes 82.0 <br />Distal Pit St. Vrain M-89-029 11/14/2006 57172-F Yes 75.8 <br />T Pit St. Vrain M-94-027 11114/2006 None No 0.00 <br />to ner Pit Upper Poudre M-99-021 11114/2006 62446-F No 3.2 <br />W.W. Farms Pit Lower Poudre M-99-098 11114/2006 62555-F No 4.73 <br />F-Street Pit Lower Poudre M-92-069 11114/2006 58779-F Yes 7.0 <br />Loloff Pit Lower Poudre M-85-112 11/1412006 62662-F No 8.30 <br />East 8th Street Pit Lower Poudre M-00-082 1 i/14/2006 63551-F Yes 0.72 <br />The mining site locations are specified in Table 2 below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.