Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Dale : 04/27/2006 <br />User : WHE <br />State :Colorado <br />County :Dolores <br />Site :Perkins Sandstone <br />Agency or organization name : DMG <br />Permit or other job action :112c a/ <br />Task description :Place <br />HOURLY EQUIPMENT COST <br />review <br />spill-down at SW <br />Machine description :Cat 325C L Horsepower : 140 <br />Weight (MT) : 28.18 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $33.26 NA Shift basis : 1 per day <br />Operating cosUhour : $42.57 100 Data source : (CRG) <br />Operator cost/hour : $32.72 NA <br />Total unit cosUhour : $108.55 Total fleet cost/hour : $108.55 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 120 LCY factor : NA volume : 120 LCY <br />Source of estimated volume : (25'W x 65'L x 2D) /27 = 120 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swing loadetl, dump bucket, swinQem <br />Basic job condition description <br />Secondary job contlition within basic description <br />Cycle time value <br />Bucket Capacity <br />Rated buckef capacity : i.63 LCY (heaped) Bucket size class <br />Bucket fill factor : 0.45 Rock -Poorly blasted (40 % - 50%) <br />Adjusted bucket capacity : 0.73 LCY <br />SEVERE <br />SEVERE <br />0.40 minutes <br />small <br />Job Condition Correction Factors Source <br />Site altitude : 7,650 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 109.21 LCY/hour <br />Adjusted hourly unit production : 90.64 LCY/hour <br />Adjusted hourly fleet production : 90.64 LCY/hour <br />JOB T1ME AND COST <br />Fleet size : 1 excavator(s) Total job time : 1.32 hours <br />Unit cost : $1.198 per LCY Total job cost : $144 <br />PermiUjob # : M-2006-016 <br />Abbreviation :none <br />Filename : M016-003 <br />