My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE73259
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE73259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:22:53 PM
Creation date
11/21/2007 12:38:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006016
IBM Index Class Name
Permit File
Doc Date
4/28/2006
Doc Name
Adequacy Issues
From
DMG whe
To
Geological Services
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 04/27/2006 <br />User : WHE <br />Agency or organization name <br />Permit or other job action <br />Task description <br />State :Colorado <br />County :Dolores <br />Site :Perkins Sandstone <br />DMG <br />112c application review <br />Scale highwall of loose rock <br />Permit/job # : M-2006-016 <br />Abbreviation :none <br />Filename : MO16-002 <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 325C L <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $33.26 NA Shift basis : 1 per day <br />Operating cost/hour : $42.57 100 Data source : (CRG) <br />OperatorcosUhour: $32.72 ~ NA <br />Total unit cosUhour : $108.55 Total fleet cosUhour : $108.55 <br />MATERIAL QUANTITIES _ _ -- _ <br />Initial Swell Loose <br />volume : 333 LCY factor : NA volume : 333 LCY <br /> <br />Source of estimated volume : (((3 H x 3'D) / 2) x 2000'L) / 27 = 333.3 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION _ _ _ ~ _ <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description ; SEVERE <br />Cycle time value : 0.40 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.45 Rock -Poorly blasted (40% - 50%) <br />Adjusted bucket capacity : 0.73 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,650 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shifVday) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 109.21 LCY/hour <br />Adjusted hourly unit production : 90.64 LCY/hour <br />Adjusted hourly fleet production : 90.64 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 3.67 hours <br />Unit cost : $1.198 per LCY Total job cost : $399 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.