Laserfiche WebLink
<br />C. Project Water Requirements <br />There will be no project water requirements for the development <br />mining or reclamation phases, other than occasional dust control opera- <br />tions. The amount of water needed for dust control is not expected to ex- <br />teed 1,000 gallons per week during dry conditions. By spreading recently <br />excavated sand and gravel on haul roads, the need for dust control measures <br />would be greatly reduced or even eliminated. <br />' The amount of water lost through evaporation from the pond surfaces <br />should not exceed the amount lost through evapotranspiration from agricul- <br />tured crop production. <br />' D. Water Rights and Sources <br />1 According to the recorded deed for this property, the Grantee owns <br />more than four shares of the capital stock of Hay Seed Ditch Company. <br />E. NPDES Permit <br />The operator is applying for a NPDES Permit from the Fla ter Quality <br />Control Division of the Colorado Department of Health. <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br />