Laserfiche WebLink
~~~ '~ ~~""""'""~~ '''' III IIIIIIIIIIIII IIh~ "'~''~ ~ ~ <br />. <br />~F C~~pp~ DEPARTMENT OF NATURAL RESOURCES <br />C r~j/ty ~9Q O Mome Pascoe. Executive Dnec br <br />u.o ~7: ~ MINED LAND RECLAMATION DI <br />;~~~ rt DAVID C. SHELTON, Director <br />'~ X876 # <br />Ricnartl D. Lamm <br />Governor <br />August 30, 1983 <br />Mr. W.R. and W.T. Hall <br />748 22 Road <br />Grand Junction, Colorado 81501 <br />Re: Hall Pit - File No. 83-142 <br />Dear Mr. Hall: <br />I have reviewed this application for adequacy and have the following <br />questions and coininents which must be addressed in detail at least 5 days <br />,prior to the September '21-22, 1983 meeting of the Mined Land Reclamation <br />Board: <br />A. Application <br />1. Item No. 15 states that the present land use is no use at the ~ K <br />present time. Please elaborate. <br />2. Item No. l7 states that the proposed future land use is residential ~K <br />housing. ,However, the Mesa County Planning Department has not approved <br />this site for residential subdivision upon reclamation. Please provide <br />an alternate future land use. <br />B. Exhibit C - Pre-Mining and Mining Plan Map <br />1. The map states that the contour interval is 2 feet when in realty, ~ k <br />the interval is 10 feet. Please correct this discrepancy. <br />C. Exhibit D - Mininy Plan <br />1. Please state how many inches and cubic yards of topsoil will be <br />stripped from each phase and stockpiled for later replacement. Where <br />will the topsoil stockpiles be located and how many cubic yards will be <br />in each. Please describe or indicate on a map the location of each <br />stockpile. <br />2. Topsoil to be stockpiled for greater than 1 growiny season should p k <br />have a grass cover planted to protect the soil from wind and water <br />erosion. <br />I^~ /^n...• r• ~ .. 1't.•l rl• ~ ~ .. ~ ... fl... r ~ i . i . On^n^ T. ~ r~nO~ Qrr r. <br />